FUEL TANK REMOVAL AND INSTALLATION
Rapid City, SD
Contract# GLL9AOO279
Customer Information
Raytheon Service Company
10400 W. Higgins Road
Rosemont, IL, 60018
Contact Phone Contract Amount
Helen Landwer 847-699-840 $64,830.00
Job Scope
Furnish & install temporary 100 gallon above ground diesel fuel storage tank, provide all piping. Remove & dispose of the estimated 400 gallons of diesel fuel tank from underground fuel tank. Remove and dispose of existing 500 gallon underground fuel tank. Install a new 500-gallon vaulted tank. Install fuel level probes & interstitial sensor in the new fuel tank, install support structure for above grade fuel lines, 35 gallon day tank, fuel lines, valves & conduit, fuel monitoring system consisting of smart module, control & I/O module. The existing 100 amp 42 circuit board, supply power for fuel tanks accessories. Test the new tank & piping installation provide closure report; restore site to it's original.
Awarded Date Start Date Finish Date
06/17/1998 07/08/1998 07/23/1998
Contract Days
   
N/A    
 
 
NON DIRECTIONAL BEACON
Alliance, NE
Contract# CE23AOO995
Customer Information
Raytheon Service Company
1155 Adams Street
Kansas City, KS, 66103
Contact Phone Contract Amount
Jeannie Cornish 913-551-1205 $133,000.00
Job Scope
Clear grub & dispose of all vegetation requires to complete grading for the road and 200' x 200' plot. Install 10' wide by 229.5' long concrete access road; install a crushed rock access road to the plot. The crushed rock access road shall be 275 feet in length by 10' wide with 6" of crushed rock installed over a geotextile fabric. Instal14 concrete foundation piers & steps for GFM equipment shelter. Load moves and unload GFM. Install the foundation for the NDB antenna. Load transport, unload, assemble, & install the new GFM NDB Southern Avionics Antenna Mast. Install the winch Assembly to lower the Antenna Mast. Install Earth Rod System. Install inner rings & the 10 ground radicals.
Awarded Date Start Date Finish Date
05/15/1998 06/24/1998 07/31/1998
Contract Days
   
25    
 
 
TASKER REMOVAL RVR
Rochester, MN
Customer Information
Raytheon Service Company
10400 W. Higgins Road
Rosemont, IL, 60018
Contact Phone Contract Amount
Helen Landwer 847-699-8400 $12,258.00
Job Scope
Removal of tasker 500 RVR transmissiometer receiver & projector equipment from their towers & disposal. Dismantling & removal of the receiver, projector towers & tower ladders & disposal, leveling of the earth mounds, removal of junction boxes & conduit, ground rods, ground cables, disconnecting power cables & power panel.
Awarded Date Start Date Finish Date
05/11/1998 06/22/1998 06/26/1998
Contract Days
   
12    
 
 
UPGRADE GROUNDING AND LPGBS
Sioux Gateway Airport, Sioux City, IA
Contract# DTFAO9-98-C-28058
Customer Information
Federal Aviation Administration Central Region
601 East 12th Street
Kansas City, MO, 64106
Contact Phone Contract Amount
C.O. Shepard 816-426-3052 $5,968.00
Job Scope
Upgrade of the Lighting Protection and Earth Electrode System at the Outer Marker/COMLO Site Runway 13 (100% by DEG - no asbestos)
Awarded Date Start Date Finish Date
05/26/1998 06/16/1998 06/19/1998
Contract Days
   
14    
 
 
CONSTRUCTION OF ILS SYSTEM
Moisant Field New Orleans International Airport, New Orleans, LA
Contract# DTFAO7-98-03369
Customer Information
Federal Aviation Administration Southwest Region
2601 Meacham Boulevard
Fort Worth, TX, 76137
Contact Phone Contract Amount
Brad Logan 817-222-4395 $174,458.00
Job Scope
Construction of Instrument Landing System Runway 10. (100% by DEG - no asbestos)
Awarded Date Start Date Finish Date
05/21/1998 06/01/1998 08/12/1998
Contract Days
   
60    
 
 
FUEL TANK REMOVAL AND INSTALLATION
Woodworth, ND
Contract# GLL9AOO279
Customer Information
Raytheon Service Company
10400 W. Higgins Road
Rosemont, IL, 60018
Contact Phone Contract Amount
Helen Landwer 847-699-840 $64,830.00
Job Scope
Furnish & install temporary 100 gallon above ground diesel fuel storage tank, provide all piping. Remove & dispose of the estimated 400 gallons of diesel fuel tank from underground fuel tank. Remove and dispose of existing 500 gallon underground fuel tank. Install a new 500-gallon vaulted tank. Install fuel level probes & interstitial sensor in the new fuel tank, install support structure for above grade fuel lines, 35 gallon day tank, fuel lines, valves & conduit, fuel monitoring system consisting of smart module, control & I/O module. The existing 100 amp 42 circuit board, supply power for fuel tanks accessories. Test the new tank & piping installation provide closure report; restore site to it's original.
Awarded Date Start Date Finish Date
04/21/1998 05/06/1998 06/27/1998
Contract Days
   
N/A    
 
 
REPLACEMENT OF UNDERGROUND CABLES AT THE VORTAC
Springfield, MO
Contract# DTFAO9-98-C-28022
Customer Information
Federal Aviation Administration Central Region
601 East 12th Street
Kansas City, MO, 64106
Contact Phone Contract Amount
Carrie Coffman 816-426-2642 $23,462.00
Job Scope
Replacement of Underground Cable at the Very High Frequency Omnidirectional Radio Range with Tactical Air Navigation. (100% by DEG - no asbestos)
Awarded Date Start Date Finish Date
02/17/1998 03/09/1998 03/26/1998
Contract Days
   
30    
 
 
WAAS PROJECT
Eleven Different Sites,
Contract# #FPS-LOO524
Customer Information
Raytheon Service Company
1901 Malven Avenue
Fullerton, CA, 92834
Contact Phone Contract Amount
Don Helm 714- 732-0428 $400,000.00
Job Scope
Awarded Date Start Date Finish Date
N/A 01/26/1998 N/A
Contract Days
   
N/A    
 
 
RCAG-BATTERY BACK UP SYSTEM
Mitchell Field Airport, Milwaukee, WI
Contract# GLL9ALOO20S
Customer Information
Raytheon Service Company
10400 W. Higgins Road
Rosemont, IL, 60018
Contact Phone Contract Amount
Helen Landwer 847-699-8400 $57,246.00
Job Scope
Installation of GFM 3 KW battery back-up systems, installation of new building distribution power panel, battery distribution power panel (AC), conduit, cables & associated devices, new mechanical equipment, provide temporary power to existing radio equipment during construction, remove & storing the existing E/G & associated equipment.
Awarded Date Start Date Finish Date
10/06/1997 01/13/1998 03/26/1998
Contract Days
   
35    
 
 
MODIFICATION TO AIR SURVEILLANCE RADAR
Various Locations, LA & TX
Contract# DTFAO7-97-R-O3326
Customer Information
Federal Aviation Administration Southwest Region
2601 Meacham Blvd.
Fort Worth, TX, 73137
Contact Phone Contract Amount
Ellis C. Mack 817-222-4396 $89,760.00
Job Scope
Provide labor and materials & equipment for ASR-9 additional grounding Grid at 12 ASR-9. (100% by DEG - no asbestos)
Awarded Date Start Date Finish Date
10/15/1997 12/02/1997 01/09/1998
Contract Days
   
75    
 
 
 Side Photo

Airport Lighting Systems

Airport Landing Systems